The task of drawing up the plans for the Tiné dam and the associated water adit structures has been entrusted to Tractebel Engineering - France (Coyne et Bellier), which will also be responsible for supervising and inspecting the equipment and plans for the construction work on behalf of the General Directorate for Dams and Large Hydraulic Projects (Tunisia). The reservoir will provide potable water and water for irrigation.