Project development, preliminary and basic design, wind resource assessment, tender preparation and bid comparison, construction management and O&M support to the client, Electrabel for the construction of a 12 MW wind farm at Hoogstraten.
2004 - 2004
Belgium
Biomass co-combustion
Design, EPC contract preparation & negotiation, technical assistance for construction & commissioning of a biomass co-combustion in the existing 70 MW coal-fired power plant of Electrabel at Rodenhuize.
2003 - 2005
Belgium
Energie Masterplan UZ Gasthuisberg
Energie Masterplan for the UZ Gasthuisberg Hospital complex. Long term strategic options for the energy supply, heat & cold, on-site renewable energy, cogeneration & energy efficiency, environmental constraints and reliability objectives.
2005 - 2006
Belgium
Lages Biomass Plant
Owner's Engineering mission for Tractebel Energia for the construction of a wood waste fired 28 MW - 120 tonnes/hour steam biomass plant.
2004 - 2004
Brazil
Off-shore wind farm
Design of a huge off-shore wind park for C-Power off the Belgian coast on the Thornton bank. 60 wind turbines with a capacity ranging from 3,6 to 5 MW will generate over 700 GWh per year. This is the annual consumption of 180,000 families. 37 km long 150 kV connection to the belgian network.
2004 - 2007
Belgium
Wind farms in the Rhône Valley
Project development support, design, contract preparation and bid comparison for the implementation of 70 MW wind energy projects in the Rhône Valley, at Fos-sur-Mer for CN'Air.