Feasibility study, basic and final design and works supervision for the construction of the Berke Arch dam (h=201 m) and hydroelectric development (510 MW).
1988 - 2002
Turkey
Cana Brava dam and hydropower plant
Suez Energy International and Mercosul entrusted us the construction contract management support for the implementation of the hydroelectric power plant on the Cana Brava dam, composed of a gravity dam in roller compacted concrete (h = 65 m), an earthfill dam (h = 65 m), a water intake and a 3 x 150 MW powerhouse.
Development of the detailed design and supervision of the civil works construction and supply, erection, testing and commissioning of the electromechanical equipment for Hidropaute.
2005 - ongoing
Ecuador
Rehabilitation of the Butchenbach Dam
Rehabilitation and waterproofing of the Butchenbach multi-arch dam of Electrabel, in the Belgian Ardennes. Placing of a watertight PVC-film upstream connected with a drainage system to collect residual moisture.