Project development, preliminary and basic design, wind resource assessment, tender preparation and bid comparison, construction management and O&M support to the client, Electrabel for the construction of a 12 MW wind farm at Hoogstraten.
2004 - 2004
Belgium
30 MW heat recovery power station in Goa
Goa Energy Private Limited (GEPL) ordered our company the study for the recovery of the heat from the gas and coke oven blast furnace gas using a closed-cycle water-cooling system.
2004 -
India
Al Ezzel combined cycle power plant
Owner's Engineer mission for Suez Energy International and its partner Gulf Investment Corporation for the installation of a combined cycle power station running on natural gas with a total capacity of 950 MW, and with a production capacity of 470 MW in open cycle in a first phase.
2004 - 2006
Bahrain
Berke dam and hydropower plant
Feasibility study, basic and final design and works supervision for the construction of the Berke Arch dam (h=201 m) and hydroelectric development (510 MW).
1988 - 2002
Turkey
Biomass co-combustion
Design, EPC contract preparation & negotiation, technical assistance for construction & commissioning of a biomass co-combustion in the existing 70 MW coal-fired power plant of Electrabel at Rodenhuize.
2003 - 2005
Belgium
Cana Brava dam and hydropower plant
Suez Energy International and Mercosul entrusted us the construction contract management support for the implementation of the hydroelectric power plant on the Cana Brava dam, composed of a gravity dam in roller compacted concrete (h = 65 m), an earthfill dam (h = 65 m), a water intake and a 3 x 150 MW powerhouse.
1999 - 2002
Brazil
Denox / Desox of 3 units of the Ruien power plant
Feasibility study, basic design and complete EPCM mission for the Denox and Desox of 3 units (130/130/200 MW) of Electrabel's thermal power plant at Ruien.
2003 - 2007
Belgium
Design of electricity transmission systems
Design of electricity transmission systems in the states of Acre and Rondonia, in the north of the country, for Eletronorte.
2004 - 2005
Brazil
Electric interconnection study
Analysis of the technical and economic possibilities of an interconnection between the respective countries, on demand of EEHC, GECOL, STEG, SONELGAZ and ONE. Studies of various routes over 4,000 km along the River Nile, the Mediterranean Sea and the Atlantic Ocean.
2002 - 2004
Algeria Egypt Libyan Arab Jamahiriya Morocco Tunisia
Energie Masterplan UZ Gasthuisberg
Energie Masterplan for the UZ Gasthuisberg Hospital complex. Long term strategic options for the energy supply, heat & cold, on-site renewable energy, cogeneration & energy efficiency, environmental constraints and reliability objectives.
2005 - 2006
Belgium
Irapé 360 MW Hydroelectric Power Plant
Design and project management for the construction of the Irapé dam, the highest dam of Brazil (208 m) and hydropower plant (360 MW), and the diversion of the Jequitinhonha river into two tunnels of over 1200 m each, for Cemig.
2002 - 2006
Brazil
Lages Biomass Plant
Owner's Engineering mission for Tractebel Energia for the construction of a wood waste fired 28 MW - 120 tonnes/hour steam biomass plant.
2004 - 2004
Brazil
Mazar 180 MW hydroelectric power plant
Development of the detailed design and supervision of the civil works construction and supply, erection, testing and commissioning of the electromechanical equipment for Hidropaute.
2005 - ongoing
Ecuador
Off-shore wind farm
Design of a huge off-shore wind park for C-Power off the Belgian coast on the Thornton bank. 60 wind turbines with a capacity ranging from 3,6 to 5 MW will generate over 700 GWh per year. This is the annual consumption of 180,000 families. 37 km long 150 kV connection to the belgian network.
2004 - 2007
Belgium
Protective relaying system study for the SEC transmission network
Framework contract for the review of the protective relaying system on all high voltage networks (from 110 kV to 380 kV) of the Saudi Electric Company. The purpose is to establish and apply a uniform standard in protective scheme principles, equipment selection, setting practices, maintenance and documentation, to be applied in all sub-regions of the SEC company.
2004 - 2008
Saudi Arabia
Rehabilitation of the Butchenbach Dam
Rehabilitation and waterproofing of the Butchenbach multi-arch dam of Electrabel, in the Belgian Ardennes. Placing of a watertight PVC-film upstream connected with a drainage system to collect residual moisture.
2004 - 2004
Belgium
Renovation of electric substations
Transelectrica selected Trapec to carry out the renovation of the Fundeni, Rosiori and South Bucharest substations, in order to improve the reliability of the transmission system.
2004 - 2005
Romania
Repowering of unit 1 (800 MW) of the Vado Ligure power plant
Owner's Engineer mission for Tirreno Power related to the repowering of unit 1 (800 MW) and unit 2 (440 MW) of the Vado Ligure power plant, with option for replacing unit 2 by a new ultrasupercritical coal-fired unit.
2004 - 2007
Italy
Rotterdam Coal fired power plant
Pre-feasibility and feasibility study (basic design) for a new ultrasupercritical 750 MW coal fired power plant, for Electrabel Nederland.
2005 - 2006
Netherlands
Wind farms in the Rhône Valley
Project development support, design, contract preparation and bid comparison for the implementation of 70 MW wind energy projects in the Rhône Valley, at Fos-sur-Mer for CN'Air.
2004 - 2006
France
Yemen - Saudi Arabia Interconnection
The Arab Fund for Economic & Social Development entrusted us the technical and economical feasibility study, and selection of technologies for the Yemen - Saudi Arabia electrical interconnection project.