ProCes, a Belgo-Dutch organisation entrusted our company the hydraulic studies and inundation risk evaluation, infrastructure conceptual design and social cost benefit for the improvement of the navigability, safety and ecology on the Scheldt Estuary.
2002 - ongoing
Belgium Netherlands
Zwin nature reserve preservation
Study of different scenario's in order to fight against the silting up of the Zwin natural reserve. Evaluation of different solutions: construction of a dam, excavations, creation of a new polder.
2006 - ongoing
Zaire
Monitoring and maintenance of 16 irrigation dams
The Tunisian Ministry of Agriculture, Environment and Hydraulic Resources renewed the collaboration with Coyne et Bellier for the technical inspection of 16 dams at the rate of one civil engineering inspection and one electromechanical inspection per dam every three years on average. Examination of the results, reporting of anomalies and advise on actions to be taken.
2004 - ongoing
Tunisia
Sigma Plan
The Administration of Waterways - Department SeaScheldt asked to develop a protection plan to inundations originating from storm tides eventually combined with high run-off discharges in the upper reaches. Considering dike strengthening, construction of controlled inundation areas, construction of a flood barrier downstream Antwerp.