Design for the construction of the LNG receiving terminal of Transgas Atlantico at Sines, comprising two full containment LNG storage tanks with a net capacity of 120,000 m³ each, LNG unloading facilities, inclusing a jetty head, unloading berth, LNG ship unloading arms and a ship gangway giving access to carriers up to 165,000 m³.
2001 - 2003
Portugal
Owner's Engineer for LNG terminal extension
Owner's Engineer assignment including contract management and follow-up of all design and construction activities for the extension of the Zeebrugge LNG terminal of Fluxys with a 4th tank for LNG storage (capacity 140,000 m³) and additional installations for regasification and send-out the gas in the transportation network.
2005 - ongoing
Belgium
LNG Terminal Project in Morocco
Afriquia Gaz s.a., the Office National de l'Electricité and Société Anonyme Marocaine de l'Industrie
du Raffinage have entrusted Tractebel Engineering with the feasibility study, front end engineering and design (FEED) and turnkey contracting assistance for construction of a new LNG import
terminal (5 billion m³/year) and a gas pipeline in Morocco.
2006 - 2007
Morocco
LNG Receiving Terminal in Thailand
For Petroleum Authority of Thailand, Tractebel Engineering provided services covering site selection, Risk and Environment Impact Assessments and Conceptual Design for construction of a LNG Terminal.
1993 - 1995
Thailand
LNG Receiving Terminal in Taiwan
The project included risk assessments, feasibility study and shipping study for a LNG Terminal located in the Northern part of the island.
1991 - 1992
Taiwan
Kitimat LNG Import Terminal
FEED for a new LNG terminal at Kitimat. The project includes unloading facilities equipped with 4 unloading arms and provision for the installation of a fifth, two LNG storage tanks of 160.000m³, gas vaporiser, send out facilities, associated facilities and buildings, LPG storage and loading facilities.
2005 - 2005
Canada
Floating storage and Regasification Unit
For SUEZ Andino, Tractebel Engineering provided Technical Assistance for the development of a new Floating Storage and Regasification Unit in Chile.
2005 - 2006
Chile
FEED study of the Porto Empedocle LNG terminal
Nuove Energie has awarded to Tractebel Engineering and Tractebel Engineering Italian Branch a contract
for the FEED study for a new 8 billion m³/year LNG import terminal, including shipping study, marine access and operation, optimisation studies and simulation reports, EPC bid packing, EPC cost and schedule estimations, and seismic study.