Basic design of two natural gas compressing stations for Fluxys at Zelzate and Angleur. Connections to the existing grid and rerouting of existing lines near the stations. The Zelzate station has a capacity of 1,000,000 Nm³ (electrical installed capacity of 32 MWe) and will increase the transport capacity of the gas grid. The Angleur pressure-reducing station has a capacity of 60,000 Nm³/h and reduces pressure from 55 to 14.7 barg.
2005 - 2005
Belgium
Extension of a gas pipeline from Thulendi to Phulpur (140 km)
Design and project management for the extension of a gas pipeline owned by GAIL by 140 km from Thulendi to Phulpur, in order to distribute vaporised LNG.